AD4S - Basement Shack/Office

January, 2006

Ceiling Insulation In - Ready for the Sheet Rock and Paneling

All of the outlet and lighting wiring is in and ceiling insulation is complete and the ceiling is ready for sheet rock.  The ceiling will also be covered in "bead board" paneling.  My fine son, Brian, came over and spent the day helping put in the ceiling.

We used a panel lifter (one of the best pieces of equipment ever made) to hoist the sheet rock and panels to the ceiling and hold them while the screws and brads were put in.  Both the sheet rock and paneling were also glued in place.

This was a long, 8 hour process that started with the insulation installation.  You can see from my picture that I was beat before we even got to the paneling.

Pickett, AD4S

P1160256.JPG (134793 bytes)
P1160257.JPG (144724 bytes)
P1160259.JPG (124965 bytes)
P1160260.JPG (102151 bytes)P1160261.JPG (97431 bytes)

This page last updated 01/19/2006