AD4S - Basement Shack/Office

January, 2006

Wall Insulation in and Sheet Rock Hung

Now comes the hard part.  All of the low and high voltage wiring is pulled and some already wired to outlets.  All of the seams have fiberglass mesh tape and all the corner bead is in.  Some mud has been applied to stabilize some of the larger seams.

The opening in the 2nd picture is under where the waste water line goes out through the foundation.  The current plan is to put a cabinet in that corner with an "N" guage model railroad set on top of it and I put a platform in the opening that will be the mountain tunnel.  I went ahead and put the sheet rock over it since I don't know when the train will get here.

So on to the mud, finishing and trim.

Pickett, AD4S

P1210262.JPG (98160 bytes)
P1210263.JPG (92142 bytes)
P1300267.JPG (65616 bytes)
P1300268.JPG (60289 bytes)P1300269.JPG (56966 bytes)
P1300270.JPG (55712 bytes)

This page last updated 01/30/2006