"SFFF"    Sheetrock Finishing (mud) is Finally Finished.

 

Well it took almost 2 weeks part time but I am finally finished with the dry wall work.  Vacuumed and mopped the floor so will start on the paint and trim tomorrow.

For the first time I put a 3rd (skim) coat on the finish and sanded lightly with dry wall sand paper instead of a screen.  It really made a difference even if it tood a little longer.

I will go back and cut the opening for the model train tunnel and the waste water cleanout when I do the trim.

 