AD4S - Basement Shack/Office

February, 2006

Trim, Caulk, Paint, Lighting and Electrical Done

This took a lot longer than I thought it would but there was a lot of wait time between coats of paint on the woodwork.  There was a lot of trim work and caulking that took time to get right.

Now on to the bookshelves, storage cabinets, work surfaces and floor. 

Pickett, AD4S

These pictures are not up to my normal standard.  My digital camera was dropped (not by me) and damaged and I used a cheap "point and shoot" camera to take these pictures.

srdone1.jpg (113381 bytes)
srdone2.jpg (109377 bytes)
srdone3.jpg (97971 bytes)

This page last updated 03/18/2006