It took almost all of April to get this storage cabinet done.  A couple of starts and restarts to the engineering due to the fact that the basement wall was not vertical or straight.  I had to put a back on the cabinet and trim the end because of these problems but it all turned out OK.

I chose to stain the cabinets and bookshelves since the room was beginning to look like a hospital with all the white.  There will be louvered bifold doors on this cabinet once the ceramic tile floor is installed.

I got some dust on the lens in the 2nd picture but had already loaded up the cabinet so did not do the picture over.  You get the idea.

Now on to the bookcases.

P5020046.JPG (70482 bytes)
P5020047.JPG (74594 bytes)

This page last updated 05/02/2006